Redring LP330 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Chauffe-eau et chaudières Redring LP330. Redring Hotbox Boiler Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 13
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Page 1 of 13
Redring Hotbox Boiler
Models L318 and LP330
User and Installer Instructions
Please keep these instructions safe, should you move house,
please hand them over to the next occupier.
COMPLIANT TO : BS EN 60335-2, BS EN 55014-2 and BS EN 50081-1
Vue de la page 0
1 2 3 4 5 6 ... 12 13

Résumé du contenu

Page 1 - Redring Hotbox Boiler

Page 1 of 13 Redring Hotbox Boiler Models L318 and LP330 User and Installer Instructions Please keep these instructions safe, should you move

Page 2

Page 10 of 13 Fault Finding Chart If the radiators do not get hot or do not reach the boiler flow operating temperature follow the guide below to es

Page 3 - Page 3 of 13

Page 11 of 13 9. Wiring Diagram

Page 4 - Page 4 of 13

Page 12 of 13 10. Spare Parts Information Item Part Number Description Quantity 1 97392070. 300 W linear halogen bulb Model dependant 2 9739

Page 5 - Page 5 of 13

Page 13 of 13 GUARANTEE Terms and Conditions for UK & ROI (outside UK & ROI contact your local distributor) We, Applied Energy Products Limi

Page 6 - Page 6 of 13

Page 2 of 13 Redring Hotbox Boiler THE HALOGEN BOILER, L318, LP330 HALOGEN POWERED WALLMOUNTED BOILER USER&INSTALLERS INSTRUCTIONS PLEASE K

Page 7 - Page 7 of 13

Page 3 of 13 Overall Dimensions & Minimum Clearances Clearances Operational Maintenance Side mm 5 5 Top mm 200 200 Bottom mm 200

Page 8 - Page 8 of 13

Page 4 of 13 If the boiler is to be placed in a cupboard this cupboard should not be used as a storage cupboard. Ventilation should be provided as d

Page 9 - 8. Fault Diagnosis

Page 5 of 13 Example: 30L system total capacity requires an expansion vessel capacity of 30 x 0.0833 = 2.5 litres with a 0.5 bar vessel charge and

Page 10 - Fault Finding Chart

Page 6 of 13 Location Before installing the boiler check that the chosen location is suitable, ensuring adequate clearance is available for both insta

Page 11 - 9. Wiring Diagram

Page 7 of 13 Allow the heating system to reach operating temperature and then examine for water leaks. Turn off the boiler and drain whilst still ho

Page 12 - Page 12 of 13

Page 8 of 13 Replacing a bulb • Remove the lid from the bulb box, remove the faulty bulb and replace with a new bulb. Do not touch the bulb with ba

Page 13 - GUARANTEE

Page 9 of 13 Replacing the expansion vessel • Isolate the boiler using the appliance isolation valves on the flow and return connections to the boi

Commentaires sur ces manuels

Pas de commentaire